Tjippies · VEOLIA
Non-Revenue Water (NRW) Director
Description
For 170 years, Veolia has been a global leader in providing water, energy, and waste management solutions. Serving public authorities and industries across 58 countries, our comprehensive services are essential to human development and sustainable growth. As we progress alongside economic growth and human development, we continuously adapt and innovate, designing solutions that positively impact the environment and conserve resources. Veolia focuses on local solutions to purify and preserve vital resources, mitigate resource depletion, decarbonize lifestyles and production methods, and adapt to the impacts of climate change. Our mission is to build a better 21st century, and we proudly identify as #resourcers. Key figures of Veolia in the Near and Middle East Over 3,900 employees across the Near & Middle East, alongside approximately 6,000 additional employees under Enova — a dedicated Veolia division specializing in Facility Management and Energy Efficiency across the region A robust local presence spanning the UAE, Oman, Qatar, Saudi Arabia, Bahrain, Kuwait, Turkey, and Jordan Over 40 years of trusted and sustainable partnerships In the Near & Middle East, Veolia collaborates with industries, governments, communities, and commercial businesses to deliver innovative and sustainable environmental solutions needed today — balancing the needs of today with a clear vision for tomorrow. Through public-private partnerships and innovative contractual schemes, Veolia is dedicated to achieving measurable results through pragmatic, sustainable environmental solutions. For more information, please visit our Website Context This project is a comprehensive 48-month water and wastewater sector improvement program implemented in partnership with Yarmouk Water Company (YWC), the Project Management Unit (PMU), and the Water Authority of Jordan (WAJ). The initiative focuses on enhancing water service delivery through multiple technical interventions including non-revenue water (NRW) reduction, hydraulic network optimization, leak detection and repair programs, comprehensive network mapping using GIS technology, asset management system development, water quality and safety monitoring, customer service enhancement, illegal connection elimination, and infrastructure database creation. The project will deliver critical programs such as minimum water supply service standards, continuity of supply improvements, pressure and flow metering systems, electricity efficiency measures, preventive maintenance protocols, customer awareness campaigns, debt management solutions, and financial modeling for sustainable operations. Through coordinated efforts of key management staff and specialized technical experts, the project aims to modernize water infrastructure, reduce water losses, improve operational efficiency, strengthen institutional capacity, and ensure compliance with national water sector priorities and regulatory requirements in Jordan. Main Accountabilities Lead YWC's Non-Revenue Water reduction as the single accountable owner of water losses across the five governorates. Build, staff and run the NRW Directorate. Turn the NRW Action Plan and the Leakage, Intakes & Wastage Reduction Programme into measurable year-on-year results, and deliver the contractual Annual Improvement to Adjusted Non-Revenue Water Indicator (AIANI). The role also contributes directly to the Annual Water Sales Indicator (AWSI) and the Specific Power Consumption Indicator (SPCI). Support the progressive move from intermittent to continuous supply, zone by zone, and leave behind a self-sufficient YWC NRW organisation, with proven methods, tools and trained Jordanian staff, at the end of the Management Contract. Starting point (diagnosis from the Veolia work to date; figures under verification during baselining) NRW of about 47% overall, close to 70% in Mafraq; no systematic split between physical and commercial losses No District Metered Areas (DMAs) or District Metered Zones (DMZs); System Input Volumes not fully metered, so no reliable water balance No active leak detection; NRW department of 1 engineer and 3 technicians at HQ, with limited equipment Intermittent supply (about 80 l/capita/day in Irbid, Jerash and Ajloun), which limits acoustic leak detection and pressure management Many illegal connections, inaccurate mechanical meters (air registration), unmonitored tanker filling stations, and poor GIS data Detailed Job Description Scope of the position:
Internal relations (Veolia / YWC)
CEO; COO / Operations Director, Governorate Directors and ROU managers; Commercial & Customer Service Director; Technical Director; Asset Management Director; IT Director; Finance Director; HR Director; QHSE Manager; Contract Manager (KPI reporting); RRF Coordinator; YWC Control Centre (OCC); Veolia and Seureca back-stopping experts. External relations : Minister of Water and Irrigation for NRW Meetings, Water Authority of Jordan (WAJ) and Ministry of Water and Irrigation; MCPMU (contract monitoring) and any KPI verification body; US Government and other donors and IFIs; NRW contractors and suppliers (leak detection, find-and-fix, meters, PRVs, loggers, telemetry); municipalities, security and judicial authorities (illegal connections); IWA and professional networks. Management & Leadership Set up the NRW Directorate: organisation, job descriptions and staffing within the approved establishment; recruit, train, appraise and lead the team Sit on the Executive Committee; present NRW performance at the monthly performance reviews and, as required, to the Board, WAJ and MCPMU Prepare and control the NRW budget (OPEX and CAPEX); prioritise spend on cost-benefit (economic level of leakage, payback) Manage NRW contractors and service providers: specifications, procurement support, supervision, measurement and certification of works Identify and coach a Jordanian deputy and successor in line with the Management Contract handover approach Strategy & Planning Own and update the NRW Strategy and Action Plan (Deliverable 15) and the Leakage, Intakes & Wastage Reduction Programme (Deliverable 16), with quick wins and priority zones Run the NRW delivery tracker and monthly progress reporting Set NRW targets by governorate and ROU and cascade them into the YWC performance management system Contribute the NRW components of the YWC Strategic Plan 2027-2031 and of the investment programmes (RRF, donor programmes) Water Balance, Metering & KPI Establish the IWA standard water balance by governorate and supply system, with data-confidence grading Lead the programme to meter and verify all System Input Volumes (sources, production, bulk transfers) With the Contract Manager, define the AIANI baselining method and annual calculation, and prepare the evidence for verification Report NRW with standard indicators (% of SIV, m³/connection/day, Infrastructure Leakage Index where data allows) Physical (Real) Losses Hydraulic zoning: design and commission DMZs and DMAs (boundary valves, inlet meters, loggers) and run their monitoring (minimum night flow) Pressure management (PRVs, flow and time modulation) and optimisation of supply schedules with Operations Active leakage control: build in-house leak detection teams (acoustic logging, correlation, ground microphones, tracer gas) and test innovative methods (satellite, AI) where justified Set leak repair standards and response times (materials, methods, reinstatement) and monitor repair quality and speed with Operations Plan the DMA-based transition from intermittent to continuous (24/7) supply, jointly with Operations and Technical Use hydraulic models and leak history to prioritise mains and service connection replacement with Asset Management Commercial (Apparent) Losses, jointly with Commercial & Customer Service Customer meter policy: sizing, accuracy class, testing (Q1-Q3), replacement programme, air-registration issues; large-customer and bulk meters Illegal connections programme: d